{"id":4043,"date":"2014-06-19T16:45:22","date_gmt":"2014-06-19T06:45:22","guid":{"rendered":"http:\/\/pdtraining.com.au\/blog\/?p=4043"},"modified":"2014-06-19T16:45:22","modified_gmt":"2014-06-19T06:45:22","slug":"statistical-process-control-spc-lean-sigma-black-belt-certification-training-days-accelerated-brisbane-canberra","status":"publish","type":"post","link":"https:\/\/pdtraining.com.au\/blog\/lean-six-sigma-training\/statistical-process-control-spc-lean-sigma-black-belt-certification-training-days-accelerated-brisbane-canberra\/","title":{"rendered":"What is Statistical Process Control (SPC): Lean Six Sigma Black Belt Certification Training Course &#8211; Five Days Accelerated &#8211; Brisbane, Canberra"},"content":{"rendered":"<p class=\"p1\"><b>Statistical Process Control (SPC) is a methodology used to measure and control quality during manufacturing.<\/b><\/p>\n<figure class=\"figure alignleft\"><a href=\"\/courses\/lean-six-sigma-black-belt-certification-training-accelerated-5-days-course\" target=\"_blank\" rel=\"\/courses\/lean-six-sigma-black-belt-certification-training-accelerated-5-days-course\"><img loading=\"lazy\" decoding=\"async\" title=\"Lean Six Sigma Black Belt Certification Training Course \u2013 Five Days Accelerated in Brisbane, Canberra\" src=\"\/blog\/wp-content\/uploads\/2014\/01\/photodune-2755284-business-progress-xs-300x200.jpg\" alt=\"Lean Six Sigma Black Belt Certification Training Course \u2013 Five Days Accelerated - delivered by pdtraining in Brisbane, Canberra\" width=\"300\" height=\"200\" \/><\/a><figcaption>Manage Lean Six Sigma Projects with training<\/figcaption><\/figure>\n<p class=\"p1\"><span class=\"s1\">To achieve Black Belt in Lean Six Sigma, consider using <a title=\"Lean Six Sigma Black Belt Certification Training Course - 5 days Accelerated\" href=\"\/courses\/lean-six-sigma-black-belt-certification-training-accelerated-5-days-course\" target=\"_blank\">Lean Six Sigma Black Belt Certification Training Course \u2013 Five Days Accelerated<\/a> &#8211; delivered by pdtraining in Brisbane, Canberra and other cities in Australia.<\/span><\/p>\n<p class=\"p1\"><span class=\"s1\">SPC is used under the Control phase of DMAIC (Define, Measure, Analyze, Improve, and Control). The Control phase of DMAIC involves controlling processes with the aim of retaining the process optimisation achieved through DMAIC. For controlling processes under Lean Six Sigma, Statistical Process Control is used along with other methodologies.<\/span><\/p>\n<p class=\"p1\"><span class=\"s1\"><b>How Does Statistical Process Control Work<\/b><\/span><\/p>\n<p class=\"p1\"><span class=\"s1\">Process measurement is conducted in real-time to <a title=\"Lean Six Sigma Process Management Training\" href=\"\/courses\/lean-six-sigma-process-management-training-course\" target=\"_blank\">control a process<\/a>. The data collected is used to determine the capacity of the process and for setting up of the control limits of a process. If a process is operating under the control limits, then the optimisation achieved through process optimisation is being sustained. If not, measures must be taken to detect and eliminate defects causing a process to function less than its capacity.<\/span><\/p>\n<p class=\"p1\"><span class=\"s1\"><b>Benefits of Statistical Process Control<\/b><\/span><\/p>\n<p class=\"p1\"><span class=\"s1\">Statistical Process Control is preferred over other methods of quality control because it allows early detection of problems. SPC can detect bottlenecks, areas of waste such as waiting, delays, etc. As SPC identifies errors early and prevents defects from growing larger and causing damage, it leads to the following advantages:<\/span><\/p>\n<ul>\n<li>Lowering of the cost of manufacturing<\/li>\n<li>Sustaining the optimisation achieved in processes<\/li>\n<li>Improving productivity of processes by identifying and preventing errors<\/li>\n<li>Reducing variability<\/li>\n<li>Reducing waste<\/li>\n<li>Providing real-time data to help decision-making<\/li>\n<li>Preventing and identifying defects<\/li>\n<\/ul>\n<p class=\"p2\"><span class=\"s1\">SPC allows a company to lower costs while sustaining the improvement achieved through the <a title=\"Lean Six Sigma Project Selection Training Classes\" href=\"\/courses\/lean-six-sigma-project-selection-training-course\" target=\"_blank\">implementation of Lean Six Sigma<\/a>. This tool is one of the many tools used in Lean Six Sigma to identify and remove errors, enhance process productivity, and sustain the productivity achieved. Along with SPC, other methods such as capability analysis, defect controls, Lean controls, and Six Sigma control plans are also used to sustain the results achieved through Lean Six Sigma.<\/span><\/p>\n<p class=\"p1\"><span class=\"s1\"><b>Control Quality using Statistical Process Control<\/b><\/span><\/p>\n<p class=\"p2\"><span class=\"s1\">If your company is suffering from quality issues, then you need to first establish the cause for variation or deterioration in quality. DMAIC methodology for process optimisation under Lean Six Sigma helps companies to detect and prevent errors, gather relevant data to establish baselines, implement the planned improvements, and control processes to sustain the improvements made. This leads to drastic enhancement in the productivity of a process, enhancement in quality due to defect removal, and lowering of costs due to the elimination of waste.<\/span><\/p>\n<p class=\"p2\"><span class=\"s1\">The use of Lean Six Sigma is widespread because it is a scientific, data-driven set of methodologies that lead to drastic lowering of variability in processes, reduction in waste, and elimination of errors. Companies have been able to substantially reduce their costs of production while improving the quality of their end product\/service by implementing Lean Six Sigma.\u00a0<\/span><\/p>\n<p class=\"p1\"><span class=\"s1\"><a title=\"\/blog\/lean-six-sigma-training\/areas-waste-lean-sigma-awareness-training-melbourne\/\" href=\"\/blog\/lean-six-sigma-training\/areas-waste-lean-sigma-awareness-training-melbourne\/\" target=\"_blank\">Related Article&#8230;<\/a><\/span><\/p>\n<p class=\"p2\" style=\"text-align: center;\"><span class=\"s2\"><a href=\"\/pd-training-reviews\"><b>Pdtraining<\/b><\/a><\/span><span class=\"s3\"><b> delivers 1000\u2019s of professional development courses each year in Brisbane, Sydney, Parramatta, Melbourne, Adelaide, Canberra and Perth, so you can be assured your training will be delivered by a qualified and experienced trainer.<\/b><\/span><\/p>\n<p class=\"p2\" style=\"text-align: center;\"><span class=\"s3\"><b>All public\u00a0<a title=\"Lean Six Sigma Black Belt Certification Training Course - 5 days Accelerated\" href=\"\/courses\/lean-six-sigma-black-belt-certification-training-accelerated-5-days-course\" target=\"_blank\">Lean Six Sigma Black Belt Certification Training<\/a><\/b><b>\u00a0courses include am\/pm tea, lunch, printed courseware and a certificate of completion.\u00a0 Customised courses are available upon request so please contact pdtraining on\u00a01300 121 400 to learn more.<\/b><\/span><\/p>\n<p class=\"p2\">\n","protected":false},"excerpt":{"rendered":"<p>Statistical Process Control (SPC) is a methodology used to measure and control quality during manufacturing. To achieve Black Belt in Lean Six Sigma, consider using Lean Six Sigma Black Belt Certification Training Course \u2013 Five Days Accelerated &#8211; delivered by pdtraining in Brisbane, Canberra and other cities in Australia. SPC is used under the Control [&hellip;]<\/p>\n","protected":false},"author":14,"featured_media":2776,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[439],"tags":[1353,1354,1652,1350,1351,1352,1220],"views":0,"_links":{"self":[{"href":"https:\/\/pdtraining.com.au\/blog\/wp-json\/wp\/v2\/posts\/4043"}],"collection":[{"href":"https:\/\/pdtraining.com.au\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/pdtraining.com.au\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/pdtraining.com.au\/blog\/wp-json\/wp\/v2\/users\/14"}],"replies":[{"embeddable":true,"href":"https:\/\/pdtraining.com.au\/blog\/wp-json\/wp\/v2\/comments?post=4043"}],"version-history":[{"count":1,"href":"https:\/\/pdtraining.com.au\/blog\/wp-json\/wp\/v2\/posts\/4043\/revisions"}],"predecessor-version":[{"id":4044,"href":"https:\/\/pdtraining.com.au\/blog\/wp-json\/wp\/v2\/posts\/4043\/revisions\/4044"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdtraining.com.au\/blog\/wp-json\/wp\/v2\/media\/2776"}],"wp:attachment":[{"href":"https:\/\/pdtraining.com.au\/blog\/wp-json\/wp\/v2\/media?parent=4043"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/pdtraining.com.au\/blog\/wp-json\/wp\/v2\/categories?post=4043"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/pdtraining.com.au\/blog\/wp-json\/wp\/v2\/tags?post=4043"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}